Fire Prevention / Inspection

  1. Patrick Farrow

    Captain - Fire Prevention Officer

Wilbraham Fire Department

Fire Prevention / Code Compliance Division


FEE SCHEDULE 2025


Smoke Detector & Carbon Monoxide System Sale/Transfer
Single/Two Family
$50
3-5 Units
$150
Re-Inspection (Per Unit) Charged at discretion of inspector with justification.
$25
Chapter 148 26C & 26E (Per Unit) 
$50
Re-Inspection (Per Unit) 
$25
Temporary Use Permit 
$200




New Protection Systems & New Building
1 & 2 Family Dwellings (Fire Alarms w/plan review) 
$50
Site Plan (Planning & Zoning Board) 
$50
Plan Review
$50
Sprinkler Plan Review (includes Inspection Fee) 
$100



NFPA, MGL, Chapter 148 & 527 CMR 1.00 Permits
Bonfire (MGL Chapter 148:10A) 
$50
Fireworks & Pyrotechnics (527 CMR 1.00 Chapter 65)
$50
Oil Burners & Fuel Storage (527 CMR 1.00 Chapter 11 and 66 & MGL Chapter 148:10A)
$50
Underground Storage Tank Removal 
$75
Underground/Above Ground Storage Tank Installation
$50
Transfer Tank (2-year permit, ≤119 Gallons) (527 CMR 1.00 Chapter 42)
$50
Cargo Tank Trucks (2-year permit, >119 Gallons) (527 CMR 1.00 Chapter 42)
$75
Sprinkler/Fire Alarm (Maintenance, Repair, Alterations) 
$50
ESS/Solar
$50
**** Application for Photovoltaic Plan Review


LPG/LNG Installation AST/UST (527 CMR 1.00 Chapter 69)
$50
Flammable Liquids Storage AST/UST
$50
Tar Kettle (527 CMR 1.00 Chapter 16)
$50
Gun Powder & Ammo (527 CMR Chapter 65)
$50
Flammable Storage & Use Permits (527 CMR 1:00 Chapter 66)
$50
Permit to Process Hazardous Materials
$50
General Permit (527 CMR 1:00) 
$50
Blasting (30 days) (527 CMR 1.00 Chapter 65) 
$50 + Standby
Carbon Monoxide or Technical Option (527 CMR 1.00 Chapter 13)
$50
Welding or Hot Works (527 CMR 1.00 Chapter 41) 
$50


*All permit fees include inspection